What we know
Milepost 81.6, 'where a depot, section house, water tank, and sidetrack marked a connection' with the Manitou branch, graded to Evergreen Cemetery by Oct. 16, 1882, its first passenger train on Dec. 10, 1882 (Jones, Colorado & Southern Railway's D&NO Route, 2022, S-0311, pp. 24, 129). Split 2026-10-24 from the old Jimmy Camp entry, which had joined the two.
Where it was
The abandoned grade's junction with the eastward spur in OpenStreetMap (S-0103), the 1893 USGS sheet's 'Junction' 0.3 mile away (S-0139); SE1/4 Sec. 8, T14S R65W. Good to about a quarter mile.
Placed from a written description, such as a land section, a distance from a landmark or an old survey note.
Sources
- S-0103: OpenStreetMap extracts via the Overpass API (2026-10-05)
- S-0139: U.S. Geological Survey, 1:125,000 topographic sheets of 1892–1894: Big Springs (1893), Castle Rock (1894), Colorado Springs (1893), Limon (1892), Pikes Peak (1894), Platte Canyon (1893), Sanborn (1893)
- S-0311: James R. "Jim" Jones, Colorado & Southern Railway's D&NO Route (Colchester, Vt.: Tell-Tale Productions, 2022), about 256 pp., ISBN 978-1-7348484-1-0
Sources are named in the text above. Numbers such as S-0080 refer to our source list. Most newspaper quotations were read in the Colorado Historic Newspapers Collection. Long quotations from recent books are shortened here.